top of page

Healthcare
Facilities

West Wing 10th Floor Modernization

Agency:

Jackson Health System

Year Completed:

2016

Scope of work:

The scope of work included demolition, asbestos abatement, installation of a new drywall system, new flooring, carpentry, application of new finishes including sheet vinyl, millwork, wall protection, ceilings, handrail, crash rail, and painting. The renovation also involved intricate installation of new mechanical and electrical systems, including critical and normal power, medical gases, fire protection, fire alarms, medical headwalls, plumbing, a nurse station, a new nurse call system, and achieved ADA and life safety compliance.

CT Scan Build Out and Installation

Agency:

Jackson Health System

Year Completed:

2017

Scope of work:

The scope of work consisted of mechanical, electrical, plumbing, fire protection, millwork, finish carpentry, abatement, doors, and hardware. Mechanical work involved ductwork, insulation, valves, dampers, balance testing, and controls. Electrical work included LED lighting, receptacles, switches, panel upgrades, fire alarms, security, and nurse call systems. The restrooms were renovated for ADA compliance. Fire sprinklers were replaced and relocated, and the medical gases system was updated. Interior renovations included carpentry new doors, frames, and hardware. 

Dual Plane Cath Lab Installation

Agency:

Broward Health

Year Completed:

2020

Scope of work:

The work involved the renovation of approx. 1,357
square feet of space to accommodate a new dual Plane Cath lab; this included equipment installation and finish upgrades of the existing procedure room. Scope of work included new interior finishes, mechanical, electrical, plumbing, medical gases, nurse call system, structural steel, and fire protection systems within the procedure room. A UPS system was also installed to serve the equipment.

3T MRI Build Out and Installation

Agency:

Broward Health

Year Completed:

2019

Scope of work:

The project entailed renovating the space to accommodate a new dual-plane cath lab, including equipment installation and finishing upgrades to the existing procedure room. The scope of work included new interior finishes, as well as upgrades to mechanical, electrical, plumbing, medical gases, nurse call systems, structural steel, and fire protection systems within the procedure room. Additionally, a UPS system was installed to support the equipment.

Lakeside Medical Center Pharmacy 

Agency:

Healthcare District of Palm Beach County

Year Completed:

2019

Scope of work:

The project converted an existing space within the pharmacy area into a CHEMO Room, ANTE Room, and IV Room. The scope of work involved demolishing existing partitions and MEP in the space, building new partitions and low return chases, installing a new acoustical ceiling and flooring, replacing existing equipment with new hoods, and adding new mechanical equipment such as exhaust fans, diffusers, and VAVs. Additionally, new VFDs were installed in the Electrical room for the exhaust fans, along with new fire alarm devices and fire sprinklers.

Lowenstein Rehabilitation Center

Agency:

Mount Sinai Medical Center

Year Completed:

2019

Scope of work:

This project involved a complex endeavor of complete demolition within an occupied facility while maintaining stringent infection control measures, specifically complying with Class IV standards. The phased approach necessitates meticulous management of fire suppression, sprinklers, and alarm systems, as well as life safety protocols throughout the transition spaces. The integration of nurse call systems ensures continuous patient care amidst construction activities. Noise mitigation strategies alongside the safe handling of medical gases and thorough asbestos abatement procedures. Coordinated multiple MEP shutdowns.

Our Clients

Certificates, Licenses & Affiliations

CERTIFICATE

State of Florida 

Minority Business Enterprise

CERTIFICATE

State of Florida 

Certified General Contractor

CERTIFICATE

State of Florida 

Certified Roofing Contractor

CERTIFICATE

Minority Business Development Agency 

CERTIFICATE

Green Building Council

CERTIFICATE

Society of American Military Engineers (SAME)

CERTIFICATE

American Society for Health Care Engineering (ASHE)

CERTIFICATE

Associated Builders and Contractors of Central Florida

LEGO_LOGO WHITE

MBE, C.G.C., Roofing Contractor
UEI#: W5E4GGV7EWN5

DUNS: 825708287  |  CAGE: 54Y11

Miami

1011 Sunnybrook Rd, Suite #905
Miami, FL 33136
Office: 305.381.8421

FAX: 305.857.9916

Orlando

1801 Lee Road, Suite #205

Winter Park, FL 32789
Office: 407.545.8498

Palm Beach

1615 S. Congress, Suite #127

Delray Beach, FL 33445

Office: 305.381.8421

Tampa 

100 Ashley Dr S Suite #600

Tampa, FL 33602

Office: 305.381.8421

Miami  |  Tampa  |  Orlando  |  Pensacola  |  Palm Beach  |  Jacksonville

Copyright © 2024 LEGO Construction Co. All Rights Reserved

bottom of page
" class="hidden">英迈思集团